Proposed Temporary Road Closure – A600 Bedford Rd., Henlow

I have a request for a Temporary Road Closure at the above location to enable patching and surface dressing work to be carried out in safety.  Details are listed in the schedule below and having assessed the application I am satisfied the request is justified.

The alternative route for diverted traffic is as shown below and will be signed accordingly. The restrictions are to be in operation only when the necessary signs are erected on site. The Legal Order will be made to cover a twelve month period, however the closure is expected to take place  on  4 periods of up to three days from 17th October to end December 2011 and during April/May and June/July, also August/September 2012 between 0900 and 1530hrs.  Specific dates will be advertised locally closer to the time.  Access may be allowed from time to time according to local signing.

If you have any observations you wish to make I would be grateful if you could let me know as soon as possible.

Mrs. Hazel Potter, Senior Technician.

our reference

CBC4408 -RC

please ask for

Hazel Potter

direct line

0300 300 4857

       fax

0300 300 8212

e-mail

Hazel.Potter@centralbedfordshire.gov.uk

Road: A600 Bedford Rd., Henlow 

Application from: Amey for CBC – Contact – Silv Chelaru – 0300 300 8049 

Reason: To enable patching and surface dressing  work to be carried out in safety. 

Length affected: From roundabout with B659 Hitchin Rd to roundabout with A507..                                                 

Date:                          Closure is expected to take place on 4 periods of three days from 17th October to end December 2011 and during April/May and June/July, also August/September 2012 between 0900 and 1530hrs. Access may be allowed from time to time according to local signing.

Specific dates will be advertised locally closer to the time.

Alternative Route:-  At roundabout with A507 proceed on A507 in an easterly direction to roundabout with B659 Hitchin Rd.  Take 3rd exit and continue on B659 to roundabout with A600 Bedford Rd and site and vice versa.

N.B. The applicant will be responsible for taking down all Central Bedfordshire Council public notices immediately after the works requiring the order have been completed 